Installation with a crane. Lift&Slide Gealan S9000 door, scheme A, RAL 9016 white, triple glazed. Realization finished in January 2024.
Place of assembly: Belgium/Brussels
Aluminium doors made of Aluprof MB-45 profile, RAL 9016 colour. Realization finished in January 2024.
Place of installation: Belgium/Brussels
Aluminium front door Aluprof MB-79N + letter boxex, white RAL9016. Realisation finished ok december 2023.
Place of installation: Belgium/Brussels
PVC Gealan S9000 windows, triple glazed, lift&slide doors, garage gate Wiśniowski. Realisatiomn finished in december 2023.
Place of installation: Sokółka/Poland
Aluplast ID4000 windows, white. Windows installed in the livestock building. Realisation finished in december 2023.
Place of installation: Suwałki, Polska
Decco 82 windows, white, triple glazed. Realisation finished in december 2023.
Place of installation: Suwałki, Polska